Monthly Archives: June 2012

Midlothian ISD Track Update (June 30, 2012)

Frank Seale Middle School’s and Midlothian High School’s tracks received repairs to their surfaces and structural spray to extend their life cycles. The finishing touch (striping) is being applied today (Saturday, June 30), and, if needed, tomorrow (Sunday, July 1).

Posted in Construction | Leave a comment

A Hero

Today (June 28, 2012), I received a message from one of our teachers (Midlothian ISD, TX). It was about her grandfather, a WWII veteran who fought in Europe. He passed away in 2010. The granddaughter (our teacher) and her mother (the … Continue reading

Posted in Inspiration | Tagged , , | Leave a comment

2011 Bond Oversight Committee Meeting (June 26, 2012)

The 2011 Bond Oversight Committee [Midlothian ISD] met on June 26, 2012. Agenda Welcome Elect Chairman / Officials [MISD School] Board Member Role Presentations (a) FSMS Addition (b) High School #2 (Phase 1) Elect Chairman / Officials Mr. Keith Hitt … Continue reading

Posted in Bond Oversight Committee | Leave a comment

The Smiles of Summer (Open Gym)

Open Gym is somewhat self explanatory. It is a gym that is open. In this case it is The Arena (Midlothian ISD). Yes, there is adult supervision, but coaching does not take place. And it’s fun. And here comes the … Continue reading

Posted in Inspiration | Tagged | Leave a comment

High School #2 (Phase 1) – Athletic Fieldhouse Floor Plan

This is the floor plan for Midlothian ISD’s Athletic Fieldhouse for High School #2 (Phase 1).

Posted in Bond, Construction, High School #2 | Leave a comment

High School #2 (Phase 1) – Second Floor, Floor Plan

Here is a look at Midlothian ISD’s High School #2 (Phase 1)’s second floor, floor plan.

Posted in Bond, Construction, High School #2 | Leave a comment

High School #2 (Phase 1) – First Floor, Floor Plan

On June 28, 2012, VLK Architects provided this floor plan of Midlothian ISD’s High School #2 (Phase 1).

Posted in Bond, Construction, High School #2 | Leave a comment